Home   Environmental Restoration   Munitions Response   Regulatory Overview   Community Involvement   Admin Record   Technical Docs   Contacts   
Translation Disclaimer:  These documents are presented in English and Spanish for the convenience of the reader. Every effort has been made for the translations to be as accurate as reasonably possible. However, readers should be aware that the English version of the text is the official version.
TypeNameDateFile Size
IconFigure 1 NPL Agreed Areas04/2004706 KB
IconLarge map to print08/2000820 KB
IconVieques BA [August 2001]26054 KB
Icon12 CO Sites and 8 PIPAOC Sites
Icon1988 RCRA Facility Assessment
IconAOC E RI Report July 2008
IconAOC H Final ROD
IconAOC H Proposed Plan and Suporting Docs
IconClosure Plan for UST Systems Naval Station RooseveltRoads, PR
IconConfirmation Study NSRR and NASD-1986
IconDraft Environmental Impact Statement
IconDraft TCRA Air Monitoring Data Reports
IconEECA Report - 10-2007
IconFinal AOC I RI - June 08
IconFinal BA for the Former LIA R-1
IconFinal Draft Preliminary Range Assessment Report
IconFinal East Vieques Background Soil Inorganic-October 2007-RN
IconFinal Environmental Impact Statement
IconFinal ERA Phase I SI Work Plan
IconFinal ERP Technical Subcommittee Meeting summary 24 April 2007
IconFinal Expanded Preliminary PA-SI (Phase II) 7 Sites, NASD
IconFinal Initial OE Site Assessment Work Plan for Green Beach
IconFinal Master Work Plan-NASD-January 2001
IconFinal Navy, USEPA, and PREQB Responses to Public Comments on the Draft WP and SAP
IconFinal No Action Decision Document - January 2009
IconFinal No Further Action for Nine Sites
IconFinal OE Master Work Plan for Former NASD
IconFinal PA SI Work Plan for Eight PI PAOC Sites
IconFinal PA-SI Report (Phase I)
IconFinal Phase II Site Specific Work Plan Expanded PA-SI for NASD
IconFinal Remedial Investigation Work Plan for AOC R
IconFinal RI - SWMU 7 - 200803
IconFinal RI FS Work Plan for SWMU 6 and 7 and AOC H and J
IconFinal RI Report - AOC H
IconFinal RI Report - AOC J
IconFinal RI-FS Work Plan for AOC E
IconFinal SI-Expanded SI 7 CO 16 PI-PAOC
IconFinal Site Management Plan - Fiscal Year 2010
IconFinal Soil, Groundwater, Surface Water, and Sediment Background Investigation Report, NASD
IconFinal Supplemental RI WP for AOC E
IconFinal Supplemental RI WP for AOC I
IconFinal TCRA Air Monitoring Plan
IconFinal TCRA Interim Measures Work Plan Surface MEC at MRA-LIA
IconFinal West Vieques Work Plan SWMU 4 Environmental
IconFinal Work Plan and Sampling and Analysis Plan Soil Inorganics Background Investigation
IconFinal Work Plan Removal Actions SWMU 6, 7 AOC J, R
IconFINALCCP_AUG2007
IconFOSET-Finding of Suitability for Early Transfer-2001
IconInitial Assessment Roosevelt Roads (incl Vieques)-1984
IconINRMP
IconLive Impact Area Soil Sampling Report
IconMaster Quality Assurance Project Plan - May 2007
IconMay 20, 1997 Closure Report Area 2016
IconNASD Community Relations Plan 2001
IconNASD Environmental Baseline Survey 2000
IconOE Report for Green Beach
IconPrescribed Burn documents
IconResponse to TCRA in the former VNTR
IconResults of Hydrogeological Investigation, Vieques-1999
IconSWMU 4 Work Plan Addendum
IconSWMU 6 RI - FINAL
IconSWMU Ordnance Explosives Investigation
IconTCRA Interim Measures Work Plan Amendment
IconUSFWS
IconVNTR DRAFT FINAL ENVIRONMENTAL BASELINE SURVEY
IconVNTR_PHIIERA_SIWP_FINAL_NOV.pdf